Corporate food service in Cartagena
SAVIA runs daily food service for companies, plants, clinics and universities in Cartagena: on-site canteens, office lunches and wellness programmes.
- Operated canteensCorporate, institutional and industrial canteens, hospital, school and university food service, corporate cafeterias and full canteen outsourcing.
- Office lunchesExecutive boxes, the Green Line, office celebrations, board meetings and visits. No contract and no purchasing committee.
- WellnessFifteen services across six pillars, from medical care to learning, with a monthly participation report per employee. Included in the Operations contract, or standalone.
- Sectors
Frequently asked questions
How do I choose a canteen operator in Colombia?
Ask for four documents before comparing prices: a current sanitary licence for the production site, public liability insurance including product coverage, a written sanitary crisis protocol, and technical sheets for the preparations. An operator who cannot show them today will not have them on the day they are needed.
The most expensive mistake in this decision is comparing quotations that are not comparable. A price per meal may include or exclude tableware, thermal transport, service staff, special diets and the initial setup cost. Equalise the scope before you look at the number.
What is the minimum headcount to contract a canteen?
Daily food service under contract starts from 20 employees. If you would rather not sign a contract, DAILY delivery starts from 15 people per order, placed by 4:00 p.m. the previous day. The two minimums measure different things — headcount on one side, order size on the other — because they are different operations.
And if your company is smaller than that? There is still a way in: the events line has no headcount minimum and covers what a small company usually needs — a board meeting, a client visit, a celebration, a month-end close. Write to us with the date and the headcount, even if it is eight.
Can we exit the contract if the service does not work?
Yes. You can start with a 30-day paid pilot you may leave without penalty, which is how you check us without committing the whole operation. Once under contract, termination follows the 30-day notice that applies to both parties.
The reason we can offer this is the same reason you should ask for it: the burden of proof is ours, not yours. A supplier who asks for trust up front is moving the cost of checking onto you.
How can we verify how you operate before signing?
Before you contract, we walk you through the operating model, the quality and food-safety protocols, the service structure, the team accountable for it and the indicators the operation is measured by, together with the current sanitary documentation. And if you want to see the performance in a live operation, the 30-day pilot exists for that: you can exit without penalty.
What we do not do is open the production site to visits before signing, and we would rather say so here than have you find out by asking. Controlling the access of external personnel to processing areas is precisely one of the things Good Manufacturing Practices require — Resolución 2674 de 2013 — because every unplanned entry is a cross-contamination risk on food that is about to be served. Verification does not disappear with it: it runs on the same documents a sanitary auditor would review, and on the pilot, which happens at your site and with your people.
Are we exposed to our supplier's labour liabilities in Colombia?
Yes. Colombian law establishes joint liability of the contracting company for the labour and social-security obligations of its contractors. A provider that hires by the day or through intermediaries to reduce payroll charges is transferring that exposure onto your balance sheet, where your parent company's audit will find it.
We hire directly, with full social security from the first shift and no intermediate structures. It is not a differentiator we invented — it is the law, and a significant part of this sector does not comply with it. Ask any bidder for payroll evidence, not for a statement.
Do you cover night shifts and weekends?
Yes. The operation is designed around the client's actual shift pattern, night shifts and weekends included. The labour surcharges for those hours are built into the price from the proposal and remain visible: under the 2026 Colombian labour reform a Sunday service costs considerably more, and hiding that only defers the problem.
What do we receive each month besides the food?
An executive report within the first five business days: participation per employee, menu-cycle compliance, the satisfaction measurement result, incidents for the period and — the section almost nobody puts in writing — what went wrong and what was done about it.
That report is what allows an HR director to justify the spend internally, and it is also why the contract gets renewed without a price argument.
How quickly can you start?
The estimate is two weeks from signature for a standard operation, and we call it an estimate rather than a commitment because we do not yet have a reference operation that would let us guarantee it. The firm date is set in the proposal, after the assessment, once we know your site.
What is the minimum to order lunches for the office?
From 15 people, and with no contract. SAVIA DAILY is ordered per delivery, not per agreement: it does not go through supplier onboarding or a purchasing committee. The cut-off is 4:00 p. m. the day before, so what you order this afternoon arrives tomorrow.
The threshold is operational, not commercial: below 15 services the temperature-controlled transport and the tableware cost more than the food, and the price per person stops making sense for either side.
Do I need to sign a contract to order for the office?
No. DAILY exists precisely for what does not justify a contract: tomorrow's lunch, a board meeting, a visit or an internal celebration. You write on WhatsApp, we confirm menu and price the same day, and it is invoiced per delivery. No lock-in and no monthly minimum.
If the volume settles month after month, that is when an operated canteen under contract is worth looking at: the price per person changes and the monthly report and the written guarantees appear. They are two different divisions and they are contracted differently.
Until what time can I place the order for the next day?
Until 4:00 p. m. the day before. The window is not paperwork: it is the time the kitchen needs to buy fresh, produce and dispatch with a controlled cold chain. An order that arrives after that hour is scheduled for the next business day.
Is there a vegetarian or light option without ordering it separately?
Yes. The Green Line is the plant-based, light option available every day within the service, without announcing it in advance and at no different cost. It stops being a diet someone has to request and becomes one more choice of the day.
Looking for event catering? SAVIA Catering & Events

